The technology offered by moladi is simplified and not standardised. We offer a comprehensive technology that has been designed to
satisfy the requests and design requirements of our clients. Our projects department will ensure that the moladi mould system is
designed and structured to accommodate the required cultural aesthetics and functionality needed, resulting in social acceptance
within the community.
Our projects department formulates a specialised cost estimate according to the clients design
specifications. We provide the client a cost estimate specific to their architectural plans and
project requirements. A costing is calculated according to your floor plan and local material
prices specific to your project. We are able to determine the precise volumes and quantities for
the moladi formwork, mortar mix, raft foundation and materials required to build each
moladi structure.
INFORMATION WE REQUIRE TO CALCULATE YOUR COST ESTIMATE;
1.
A detailed single storey plan, including internal room and overall external metric
dimensions in AutoCAD format (not plotted)
2.
A section specifying the wall height, roof pitch in degrees and overhang in AutoCAD
format (not plotted)
3.
Elevations
4.
Complete Window and Door Schedules, specifying quantities and sizes.
5.
Specify the number of units required and in what timeframe
6.
Local material costs in US$ or ZAR.
LOCAL INDIGENOUS MATERIAL PRICES;
moladi allows for the construction process to take place anywhere in the world, making use of indigenous, or local, labour and
materials. It is imperative to obtain the local raw material and labour costs to apply to your drawings. Once we have received
the information requested, as well as the local material costs, our Projects Department will convert your design into a moladi
mould, or kit, and this layout design will be forwarded, along with the cost estimate which is calculated using the specific
material costs supplied for that particular territory.
COST ESTIMATE BREAKDOWN;
The detailed cost estimate is divided into the following categories:
•
Raft foundation and floor slab
•
Superstructure - the shell
•
Windows
•
Doors
•
Roof
•
Ceiling
•
Plumbing
•
Electrical
•
Paint
•
Preliminary and general
FINISHING MATERIALS;
•
Windows
•
Doors
•
Roof structure and materials
•
Ceiling
•
Plumbing
•
Electrical
•
Paint
All the above finishing materials will reflect general South African prices in the cost estimate. These costs should be replaced
with pricing that is relevant to your indigenous cost of finishing material suppliers in order to further ensure the accuracy of the
unit cost.
PRELIMINARY AND GENERAL;
The establishment of the building site and site overheads depends on the project and will vary from project to project.
CLICK HERE TO REQUEST YOUR COST ESTIMATE
A cost per square metre is not
an accurate form of costing
Click here to find out why